GNSS Simulator
Talk to an engineer
GNSS Simulator

Timing Receiver & Clock Validation

GNSS Timing & Frequency Validation

Evaluate 1PPS timing and 10 MHz frequency performance in GNSS timing receivers and disciplined clocks. Apply controlled GNSS signal loss and restoration, then measure holdover drift and recovery against a defined reference and agreed test limits.

1PPS Time Error 10 MHz Frequency Offset Holdover Drift Recovery Time
Time Measurement 1PPS Time Error
Frequency Measurement 10 MHz Offset & Stability
Test States Lock / Outage / Holdover / Recovery
Comparison Basis Defined Reference & Test Limits

Principle and Measurement Architecture

How GNSS Timing Validation Works

Apply controlled GNSS RF to a timing receiver or GNSS-disciplined oscillator (GNSSDO). Compare the DUT’s time and frequency outputs with a reference that remains available throughout the outage, then align the measurements with DUT status and RF events.

01 / GNSS Available

GNSS Disciplines the Clock

A timing receiver derives time from satellite signals. In a GNSS-disciplined clock, these timing measurements steer a local oscillator. Establish stable lock and record the selected output baseline before introducing signal loss.

02 / GNSS Loss and Holdover

Observe Holdover and Output Continuity

A DUT with holdover capability continues operating from its local oscillator and control history. Time error can accumulate while an output remains present. Record output continuity, drift and the DUT’s reported operating state.

03 / GNSS Restored

Measure the Return Within Limits

After RF restoration, distinguish signal reacquisition, output relock and return within the agreed limits. Continue measuring through correction and settling; define how long compliant outputs must remain stable.

Conceptual Test Bench

Timing and Frequency Measurement Architecture

  • Controlled GNSS RF
  • Reference and measurement paths
  • Synchronization as configured
GNSS timing test with a separate measurement reference. The simulator sends controlled GNSS RF to the DUT. DUT 1PPS goes to a time interval counter; DUT 10 MHz goes to a frequency counter or analyzer. An external reference feeds both measurement paths and synchronizes the simulator where required by the configuration. Measurements, DUT status and RF events form the test record. The measurement reference remains available during the DUT GNSS outage. MEASUREMENT REFERENCE External Time / Frequency Reference Synchronization as configured GNSS Simulator Configured signals and outage sequence Controlled GNSS RF Reference 1PPS Instrument timebase Frequency reference Instrument timebase DEVICE UNDER TEST Timing Receiver / GNSSDO Configured 1PPS / 10 MHz Outputs DUT 1PPS DUT 10 MHz TIME MEASUREMENT Time Interval Counter Compare DUT and reference pulse edges FREQUENCY MEASUREMENT Frequency Counter / Analyzer Compare frequency using the selected reference Aligned Test Records Measurements · DUT Status · RF Events
Measurement Reference

External Time / Frequency Reference

Provides comparison inputs to both measurement paths and remains available during the DUT’s GNSS outage.

Simulator synchronization follows the agreed configuration.

GNSS Simulator

Configured satellite signals and RF loss / restoration events.

Device Under Test

Timing Receiver / GNSSDO

Configured 1PPS and/or 10 MHz outputs, with DUT status recorded throughout the test.

Time Measurement

Time Interval Counter

Compare DUT and reference pulse edges.

Inputs: DUT 1PPS + reference 1PPS. Instrument timebase follows the measurement plan.

Frequency Measurement

Frequency Counter / Analyzer

Measure frequency using the selected reference.

Inputs: DUT 10 MHz + the specified frequency reference or external instrument timebase.

Aligned Test Records

Measurements, DUT status and RF event timestamps provide the evidence for acceptance review.

Measurement boundary: the simulator applies GNSS RF conditions; external instruments measure the selected DUT outputs. Log RF event times and DUT status alongside instrument measurements. Reference routing, instruments, interfaces and synchronization are defined for the test configuration.

What the 1PPS Comparison Shows

Time error is the difference between DUT and reference pulse edges at the defined observation point. Specify the edge, polarity and units, and account for the measurement-path delay.

What the 10 MHz Comparison Shows

Frequency offset describes the difference from the reference frequency. Stability describes how frequency varies over a stated averaging interval. Define the measurement duration and analysis method for each result.

Worked Timing Test Example

Example: Evaluating Holdover After GNSS Signal Loss

Follow a GNSSDO with 1PPS and 10 MHz outputs through a locked baseline, a controlled RF outage and recovery. Keep the measurement reference available throughout the sequence and evaluate both outputs against limits agreed before testing.

Example DUT GNSSDO with 1PPS and 10 MHz outputs
Test Stimulus GNSS RF interruption and restoration
Acceptance Basis Defined reference, output limits and verification window

Run the Complete Sequence

  1. Prepare the Bench and Establish Lock

    Complete the DUT’s warm-up and confirm the agreed locked state. Record the DUT configuration, reference status, RF settings, environmental conditions and instrument sampling or averaging intervals.

  2. Record a 120-Second Baseline

    Log 1PPS time error, 10 MHz frequency measurements and DUT status after stable lock is established. Use this record as the starting condition for the outage test.

  3. Interrupt GNSS RF for 600 Seconds

    Apply the configured RF interruption at a recorded time. Keep the DUT powered and scenario time advancing. Monitor loss detection, holdover entry, output continuity and drift while the RF outage is maintained.

  4. Restore RF and Observe Recovery

    Restore the original GNSS signal conditions while maintaining continuous simulated time. Record RF restoration, reported signal reacquisition and relock as separate events, alongside the measured output response.

  5. Confirm a 60-Second Compliant Window

    Start verification when both measured outputs are within their agreed limits. Restart the window if an output exceeds its limit. Record any missing or invalid measurements for review under the agreed acceptance policy.

Read the States and Measurements Together

Illustrative Traces

Swipe or scroll horizontally to view the complete phase sequence.

Illustrative aligned GNSS RF, time-error, frequency-offset and DUT-state traces. A 120-second locked baseline is followed by a 600-second RF outage, a variable recovery interval and a 60-second verification window. Conceptual traces show time-error accumulation and frequency response. Shaded bands represent agreed output limits schematically. Phase widths and response shapes are illustrative; acceptance uses actual logged measurements. Baseline · 120 s GNSS RF Outage · 600 s Recovery · Variable Verify · 60 s GNSS RF 1PPS Error 10 MHz Offset DUT State Available / off Record with units Record with units Reported status ON OFF Agreed limits · schematic Agreed limits · schematic Locked Loss Detection / Holdover Reacquire / Relock Locked Baseline record RF off RF restored Within limits Confirmed Common phase sequence · horizontal spacing is schematic
How to use this view: align RF events, DUT status and both instrument records on a common time basis. The response shapes, phase widths and limit bands above are illustrative. Use logged DUT measurements and agreed limits for acceptance; record actual status transitions separately.

Keep a Traceable Event and Measurement Record

Retain the run configuration, raw 1PPS and frequency data, measurement intervals, reference information and these event timestamps. Identify the source of each timestamp and any unavailable status fields.

Swipe or scroll horizontally to view all columns.

Event or Record What to Capture How It Is Used
Locked Baseline Stable-lock evidence and 120 seconds of timestamped output measurements. Establish the initial time error, frequency behavior and operating state.
RF Interruption Actual RF-off timestamp and interruption method. Define the start of the 600-second RF outage.
Holdover Entry DUT-reported holdover entry time, where available, and output continuity. Separate RF loss from the DUT’s recognition and response.
RF Restoration Actual RF-on timestamp and restored signal settings. Provide the common starting event for recovery measurements.
Reacquisition and Relock Separate DUT status timestamps, where reported. Compare status recovery with independently measured output performance.
Successful Verification Window Start and end of 60 consecutive seconds within both output limits, with supporting samples. Establish the recovery result and the later confirmation time.

Measurement Definitions and Decision Rules

Measurements and Acceptance Criteria

Define each measured quantity, its reference, units and observation window before running the test. Assign limits separately to the locked baseline, outage or holdover interval, and recovered state, then apply the agreed decision rule to the recorded evidence.

1PPS / Time

Define Corrected Time Error

e(t) = tDUT − tref − Cpath

Compare corresponding DUT and reference pulse edges. Cpath is the calibrated differential measurement-path delay. State the sign convention, edge polarity, observation point and time units.

10 MHz / Frequency

Define Frequency Offset

Δf = fDUT − fref
y = Δf / f0

For a like-frequency comparison, report offset in Hz or as relative frequency y. Here f0 is the nominal DUT output frequency. Specify the reference, counter timebase and averaging interval.

Unit example: at 10 MHz, a 0.01 Hz offset corresponds to 1 ppb. This illustrates unit conversion.

Connect Every Metric to an Acceptance Definition

Select the metrics required by the DUT and application. Record the numerical limits, evaluation method and data-validity rules in the test plan before execution.

Swipe or scroll horizontally to view all columns.

Metric Method and Units Observation Window Acceptance Definition
1PPS Time Error Time-interval comparison of corrected DUT and reference edges. Units: ns, µs or s. Defined baseline, outage or recovered-state interval, with timestamps and sample cadence. Compare the required samples or stated summary statistic with the time-error limit for that state.
10 MHz Frequency Offset Frequency counter or analyzer using the defined reference. Units: Hz, dimensionless relative offset, ppm or ppb. Specified gate or averaging interval and total record duration. Apply the frequency-offset limit using the agreed units, averaging method and test state.
Holdover Drift Track time error and its change from the defined starting value, together with frequency behavior. Units: time and frequency units stated above. Required RF-outage interval; record DUT-reported holdover entry separately. Evaluate absolute error, accumulated change or a time-dependent mask as specified. Retain maximum excursions and first-violation time.
Output Continuity Monitor pulse presence and frequency-output validity. Units: missing-output counts and interruption duration in s. Complete baseline, outage and recovery sequence at the defined detection cadence. Compare output interruptions with the permitted count or duration. Classify instrument logging gaps separately.
Recovery Time Aligned RF-restoration and successful verification-window timestamps. Units: s. RF restoration through recovery and the following verification window. Confirm compliant output samples for the required window, then compare recovery time with its agreed maximum where specified.
Frequency Stability, Where Required Specified analysis, such as Allan deviation σy(τ). Units: dimensionless relative-frequency stability. Defined data segment, averaging times τ, sample interval, record length and preprocessing. Compare results with the stability limit at each required τ. State the confidence basis where used.

Stability analysis: document sample spacing, gate and dead-time behavior, gaps and drift treatment. The worked example’s 60-second window verifies time-error and frequency-offset limits; a stability result uses its own suitable data record and averaging times.

Make the Acceptance Report Reviewable

For each result, identify the run and test state, measured value or statistic, units, observation interval, applicable limit, uncertainty treatment and decision. Link the conclusion to the supporting raw record and note any unresolved exceptions.

Reference, Connections and Test Setup

Reference, Interfaces and Test Configuration

Build the bench around the DUT’s input and output specifications, the required measurement limits and the complete outage sequence. Confirm reference routing, instrument capability and signal compatibility before connecting the system.

01 / Reference Planning

Match the Reference to the Measurement

Review reference uncertainty and stability over the required observation duration. Define the time and frequency outputs, routing and calibration basis, and keep the comparison reference available throughout the DUT’s GNSS outage.

02 / 1PPS Measurement

Configure the Pulse Comparison

Select a time-interval instrument that supports the required uncertainty and record cadence. Confirm pulse levels, polarity, trigger thresholds, termination and differential path-delay corrections for both channels.

03 / 10 MHz Measurement

Configure Frequency and Stability Records

Confirm the counter or analyzer’s reference input, timebase and measurement mode. Set gate or averaging time, sample spacing, dead-time handling and record length to support the selected offset and stability analyses.

Confirm Each Signal Path

Use the actual DUT, simulator, reference and instrument specifications to complete the connection plan. Record the role of every reference input and the measurement boundary at each destination.

Swipe or scroll horizontally to view all columns.

Connection Signal and Purpose Confirm Before Connection Configuration Record
Simulator → DUT GNSS Input Conducted GNSS RF for the selected signals, reception level and outage sequence. Connector, input impedance, RF level at the DUT after path loss, antenna-port DC bias and required isolation or protection. Signal selection, RF settings, cable or attenuation path and DC arrangement.
DUT and Reference → Time Instrument DUT 1PPS and reference 1PPS for edge comparison; instrument timebase as configured. Supported pulse levels and widths, edge polarity, trigger settings, termination, channel assignment and differential path delay. Channel settings, reference routing, delay corrections and sample cadence.
DUT and Reference → Frequency Instrument DUT 10 MHz with the specified comparison reference or external timebase. Input frequency range, waveform and level, connector and termination, reference-lock state, gate or averaging mode and timestamp convention. Input settings, reference mode, gate time, sample spacing and record duration.
Reference → Simulator, As Configured Timing or frequency synchronization required by the selected test architecture. Supported reference inputs and their roles, signal specifications, synchronization settings and the relationship between simulated time and the reference. Confirmed simulator interfaces, time scale, epoch and calibration or alignment basis.
Control, DUT and Instruments → Test Record RF events, available DUT status and independent output measurements. Data interfaces or export methods, shared time basis, event boundary, sample or gate timestamps, units and missing-data markers. Logging sources, formats, timestamp alignment and data-validity rules.
Test Sequence Setup

Define the Operating Conditions

DUT and Locked Starting State
Record model, firmware, oscillator or holdover mode, warm-up requirements and the evidence used to confirm stable lock.
GNSS Scenario and Time
Confirm signals, scenario location, time scale and epoch. Maintain continuous scenario time and DUT power through RF interruption and restoration.
RF Outage and Restoration
Confirm the interruption method, affected signals, outage duration and restored RF conditions. Define how actual RF event times are recorded.
Environmental and Run Conditions
Record temperature, power conditions and the starting state for each run. Identify any intentionally changed condition when comparing repeated tests.
Measurement and Data Setup

Define the Evidence to Retain

Limits and Verification Windows
Set state-specific time-error and frequency limits, required outage observation, verification duration and any maximum recovery time.
Sampling and Analysis
Record pulse sample cadence, frequency gate or averaging time, stability averaging times where required, record length and processing settings.
Timestamp Alignment and Exceptions
Confirm event and measurement time bases, gate timing and logging intervals. Define handling for missing samples, invalid readings and output loss.
Equipment and Delivery Scope
Identify the DUT, reference, instruments, RF accessories and logging tools already available. Agree the supply, integration and calibration responsibilities.

GNSS Signal Simulation Platform

NSG8000 in the Timing Test Bench

NSG8000 provides the controlled GNSS RF input for timing receivers and GNSS-disciplined clocks. Match its signals, RF settings and reference interfaces to the test architecture, then evaluate DUT outputs using the selected external reference and measurement instruments.

GNSS RF Stimulus Platform

NSG8000

Multi-Constellation GNSS Signal Simulator

NSG8000 GNSS signal simulator with a monitor showing scenario-control software

Hardware, software and accessories follow the agreed configuration.

View NSG8000 Specifications

Match Platform Functions to Timing Test Tasks

GNSS Signal Selection
BDS, GPS, GLONASS and Galileo. Confirm the required civil signals, simultaneous frequency combinations and licences for the DUT.
RF and Scenario Conditions
Use signal-level and scenario settings to establish the locked baseline and restoration conditions. Confirm the RF interruption method and event recording for the bench.
Time / Frequency Reference I/O
1PPS and 10 MHz input / output interfaces. Confirm direction, operating mode, electrical conditions and the relationship between the reference signals and simulated GNSS time.
Scenario and Run Records
Retain simulator settings and available logs with the run record. Align DUT and instrument data using the test bench’s defined time basis and recording method.

Signal combinations, reference use, RF routing and integration requirements are confirmed in the configuration baseline. Review the reference and interface requirements when specifying the bench.

Confirm the Calibration Basis for Absolute Timing

Review the required alignment between simulated GNSS time and the physical measurement reference, including path delays and calibration evidence, against the target time-error limit and uncertainty budget.

Stimulus

NSG8000 and the RF Path

Provide configured GNSS signals and the agreed signal-loss and restoration conditions through the defined RF connection.

Response

Timing Receiver / GNSSDO

Produces the selected time and frequency outputs. Its oscillator and control behavior determine the measured holdover and recovery response.

Measurement

Reference and External Instruments

Establish the comparison reference and record DUT performance. Equipment supply, integration and calibration responsibilities are agreed for the project.

Implementation, Acceptance and Handover

Commissioning and Deliverables

Connect each commissioning stage to a documented result. Agree the connection plan, test sequence and numerical acceptance criteria before bench setup, then retain the records needed to review and repeat the timing test. Delivery and support follow the agreed project scope.

From Test Definition to Operator Handover

Confirm the applicable stages, responsible parties and records below as part of the commissioning plan.

Swipe or scroll horizontally to view all columns.

Stage Commissioning Checks Record or Deliverable to Agree
Agree the Test Baseline Confirm DUT, GNSS signals, time definition, reference and instruments, starting state, outage sequence, measurement limits and decision rules. Configuration baseline, test and acceptance plan, equipment list and assigned responsibilities.
Configure and Verify Connections Check RF delivery, signal levels, DC arrangements, reference routing, pulse and frequency inputs, channel settings and required delay corrections. As-built connection map, interface and channel settings, and reference or correction records required by the plan.
Verify Lock and Recording Complete warm-up, confirm the locked starting state and collect a baseline. Check reference continuity, timestamp alignment and available DUT and instrument records. Locked-baseline measurements, setup-verification log, logging configuration and an open-item list.
Run the Outage and Evaluate Recovery Execute the agreed RF interruption and restoration sequence with continuous scenario time. Record output behavior, status events and the successful verification window. RF and DUT event records, raw time and frequency data, aligned plots, calculations and criterion-by-criterion acceptance results.
Handover the Operating Workflow Demonstrate the configured test, data export, analysis and repeat-run procedure. Review agreed training coverage and assign remaining actions. Versioned configuration files, operating and test procedures, agreed training record, and unresolved-item owners and next actions.
Bench Readiness

Prepare for Joint Commissioning

DUT, Reference and Instruments
Have the selected equipment, specifications, required cables and signal-conditioning accessories available. Confirm access to the relevant settings and records.
Test and Data Access
Prepare the agreed scenario, limits and logging method. Confirm how RF events, DUT status and instrument measurements will be collected and aligned.
Operators and Session Format
Agree the commissioning format and responsible operators. For agreed remote sessions, prepare a local operator and the required equipment and connection access.
Delivery Responsibilities

Confirm the Complete Project Package

Hardware, Software and Accessories
Itemize the simulator configuration, licences, RF routing, reference, instruments and accessories. Identify customer equipment and items supplied within the project.
Calibration and Integration Work
Assign responsibility for reference and path-delay calibration, absolute-timing alignment evidence where required, and any agreed development or data integration.
Documentation and Training
Agree document versions, configuration and data formats, operating procedures, training coverage and the record of completed commissioning activities.

Practical Questions and Engineering Enquiries

GNSS Timing Validation FAQ

Review the measurement and configuration questions below, then share your DUT, output requirements and existing equipment to request a timing test configuration review.

Which devices and outputs can this workflow evaluate?

The workflow applies to timing receivers and GNSS disciplined clocks with compatible outputs. Select 1PPS time-error measurements, 10 MHz frequency-offset and stability measurements, or both, according to the DUT. A holdover test requires a DUT with the relevant holdover capability.

Does the simulator determine holdover performance?

The simulator provides the controlled GNSS RF conditions. Holdover drift and recovery depend on the DUT oscillator, control behavior, initial state and environment. External instruments compare the DUT outputs with the selected reference while RF events and DUT status are recorded separately.

What reference and measurement equipment are needed?

Use a suitable time and frequency reference that remains available during the DUT GNSS outage. Compare 1PPS edges with a time interval instrument and evaluate 10 MHz with a suitable frequency counter or analyzer. Select equipment for the required uncertainty, electrical interfaces, sampling and data export.

Can a 1PPS comparison establish absolute timing accuracy?

Absolute timing validation requires a known, calibrated relationship between simulated GNSS time and the physical comparison reference. Define the time scale, epoch and observation point, account for RF and measurement-path delays, and evaluate uncertainty. A relative edge comparison alone does not establish absolute UTC accuracy.

Is GNSS reacquisition or relock the same as output recovery?

Record RF restoration, reacquisition and relock as separate events. Output recovery is determined by the selected measured outputs meeting their agreed limits throughout the verification window. Measure recovery time to the start of the successful window and confirm it at the end. See the measurement and acceptance rules.

Are the example test durations fixed requirements?

The 120-second locked baseline, 600-second RF outage and 60-second verification window are illustrative settings in the holdover test example. Agree durations for your DUT and application. Frequency-stability analysis requires its own suitable record length and averaging times.

Can we reuse instruments or request test automation?

Provide instrument models, interfaces, available data formats and your preferred control environment for compatibility review. Selected sequence-control, status-collection, data-alignment and reporting functions can be reviewed for customization. Confirm feasibility, dependencies, scope and acceptance criteria before including them in the project.

Which equipment and services are included in the delivery?

The agreed project package identifies simulator configuration, licences, accessories, reference and measurement equipment, together with customer-supplied items. Assign calibration, integration, commissioning and training responsibilities explicitly. Review the commissioning and deliverables when defining the quotation scope.